Woodbury Heights – Arlington, Virginia
This
EIFS building had leaked since day one and had been worked on
numerous times by a variety of contractors. The EIFS joints were
severely damaged due to previous work (joints were back wrapped
improperly). We removed all joint material and inspected for proper
construction and width. After inspection, we removed one foot
of EIFS material on each side of defective joints, reconstructed
the EIFS panels, blended the finishes to match, cleaned the entire
building of mildew, re-caulked every joint and recoated with an
elastomeric coating.